The structure itself is a variety of steel roof elements supported by cast-in concrete columns with cladding walls between them. The main challenge with this project was obviously the sheer size of the building. We had more than 15 phases for production documentation and many separate packages for different manufacturing facilities.
In addition, we tried a new strategy of drawings preparation that was required by modern CNC machinery and digital assembling software.