Olympic Center Rezekne

out_Scena-2-1
  • Rēzekne, Latvia
  • 500 tons of steel strucures
  • Total area 10,961 m²
  • Scope of work: structural calculations
  • Design and structural steel detailing
out_Scena-1-1out_Scena-14out_Scena-17out_Scena-7-1out_Scena-10-1out_Scena-18out_Scena-5-1
The Olympic Center is a multifunctional sports arena that has become the hallmark of the city.

The building consists of an arena for playing sports and an ice arena. Also on the territory of the complex there is a gym, aerobics room, shops, recreation areas and a winter garden.

The total area of ​​the Olympic Center building is 10,961.78 m2
Working on such a large project required a lot of responsibility and cohesion between all related groups of design organizations. Thanks to BIM technologies, this has become more accessible and reduced all possible risks and costs during construction.

Our company was engaged in the design of metal structures. The list of works included a check recalculation of the building frame, design and development of drawings for production and installation. Design work lasted for 8 months

Location of the completed project Rēzekne, Latvia