Razosana corpusa

The construction of a new mall for one of the largest retail operators of the brand in the baltics, Rimi Baltic, is located on the territory of a former industrial robot manufacturing plant. The project was carried out in two stages: the reconstruction of the existing building and the construction of a new section. The main elements of the building are made of combined steel-concrete structures. Due to the rather large volumes of design assembly welding, in order to simplify and speed up the assembly process, recalculation of all welded joints to bolted ones was performed.

Project: Rimi Aleja
Location: Latvia
Steel consumption: 430 t
Scope of work: calculation of joints and structural steel detailing